Investigation on the allowable load ramping-up rate and wet-to-dry conversion time of a 660MW supercritical coal-fired power plant with deep peak-shaving work conditions
Energy, Год журнала: 2024, Номер unknown, С. 134200 - 134200
Опубликована: Дек. 1, 2024
Язык: Английский