Sustainability,
Год журнала:
2022,
Номер
14(24), С. 16333 - 16333
Опубликована: Дек. 7, 2022
While
the
populations
of
cities
continue
to
grow,
institutions
are
demanding
more
sustainability
in
urban
development,
leading
a
great
increase
complexity
planning.
The
need
consider
social,
legal,
environmental,
and
economic
parameters
challenges
traditional
planning
processing
favor
an
optimized
automated
process.
Generative
design
has
potential
optimize
phase
by
automatically
generating
spatial
solutions
analyzing
them
phase.
objective
present
study
is
analyze
process
compare
it
with
digitalized
driven
using
generative
design.
This
uses
mixed
approach
four
research
methods:
document
analysis,
survey,
interviews,
case
based
Sweden.
critical
analysis
Swedish
makes
possible
define
main
barriers
Results
also
show
benefits
for
sustainable
faster
Two
conclusions
can
be
made
from
this
study:
institutional
organizational
changes
necessary
achieve
digitalization,
proves
useful
tool
that
should
considered
support
digitalization
Building and Environment,
Год журнала:
2022,
Номер
213, С. 108854 - 108854
Опубликована: Фев. 10, 2022
Growing
interest
is
awarded
to
the
digitalization
of
building
permitting
use
case
and
many
works
are
developed
about
topic.
However,
subject
very
complex
aspects
usually
tackled
separately,
making
it
hard
for
traditional
literature
reviews
grasp
actual
progress
in
overall
This
paper
unveils
detailed
state
art
Digital
Building
Permitting
(DBP)
by
critically
analysing
means
a
set
coding
tags
(research
progress,
implementation,
affected
DBP
workflow
steps,
ambitions
addressed)
assigned
multidisciplinary
team.
The
executed
research
shows
that
mainly
addressed
permit
process
technologies
check
compliance
design
proposals
against
regulations,
followed
regulations.
Improvable
identified
entire
system
instead
e.g.
involvement
officers,
scalability
solutions
interoperability
data,
intended
both
as
data
validation
integration
geospatial
with
models.
International Journal of Geographical Information Science,
Год журнала:
2022,
Номер
37(4), С. 788 - 809
Опубликована: Ноя. 8, 2022
3D
city
models
are
omnipresent
in
urban
management
and
simulations.
However,
instruments
for
their
evaluation
have
been
limited.
Furthermore,
current
instances
scattered
worldwide
developed
independently,
hampering
comparison
understanding
practices.
While
there
assessment
frameworks
open
data,
such
efforts
generic
not
applied
to
geospatial
data.
We
establish
a
holistic
comprehensive
four-category
framework
'3D
City
Index',
encompassing
47
criteria
identify
key
properties
of
models,
enabling
benchmarking,
suggesting
usability.
evaluate
40
authoritative
derive
quantitative
qualitative
insights.
The
implementation
enables
structured
the
landscape
semantic
as
well
doubles
an
evaluated
collection
models.
For
example,
datasets
differ
substantially
characteristics,
having
heterogeneous
influenced
by
different
purposes.
There
further
applications
this
first
endeavour
standardise
characterisation
data:
monitoring
developments
trends
modelling,
researchers
practitioners
find
most
appropriate
needs.
work
is
designed
measure
continuously
can
also
be
other
spatial
data
infrastructures.
Engineering Construction & Architectural Management,
Год журнала:
2024,
Номер
unknown
Опубликована: Март 28, 2024
Purpose
The
compliance
checking
of
Building
Information
Modeling
(BIM)
models
is
crucial
throughout
the
lifecycle
construction.
increasing
amount
and
complexity
information
carried
by
BIM
have
made
more
challenging,
manual
methods
are
prone
to
errors.
Therefore,
this
study
aims
propose
an
integrative
conceptual
framework
for
automated
models,
allowing
identification
errors
within
models.
Design/methodology/approach
This
first
analyzed
typical
building
standards
in
field
architecture
fire
protection,
then
ontology
these
elements
developed.
Based
on
this,
a
standard
corpus
built,
deep
learning
trained
automatically
label
texts.
Neo4j
utilized
knowledge
graph
construction
storage,
data
extraction
method
based
Dynamo
designed
obtain
files.
After
that,
matching
algorithm
devised
express
logical
rules
triples,
resulting
Findings
Case
validation
results
showed
that
theoretical
can
achieve
automatic
domain
graphs
model
compliance.
Compared
with
traditional
methods,
has
higher
degree
automation
portability.
Originality/value
introduces
natural
language
processing
technology
into
completes
process
constructing
data.
its
functionality
usability
through
two
case
studies
self-developed
platform.
Buildings,
Год журнала:
2022,
Номер
12(10), С. 1754 - 1754
Опубликована: Окт. 20, 2022
Automated
construction
progress
monitoring
using
as-planned
building
information
modeling
(BIM)
and
as-built
point
cloud
data
integration
has
substantial
potential
could
lead
to
the
fast-tracking
of
work
identifying
discrepancies.
Laser
scanning
is
becoming
mainstream
for
conducting
surveys
due
accuracy
obtained
speed
process;
however,
techniques
are
still
limited
because
complexity
methods,
incompleteness
scanned
areas,
or
obstructions
by
temporary
objects
in
sites.
The
novel
method
proposed
within
this
study
enables
extracting
BIM
data,
calculating
plane
equation
faces,
performing
a
point-to-plane
distance
estimation,
which
successfully
overcomes
some
limitations
reported
previous
studies,
including
automated
object
detection
an
occluded
environment.
Six
datasets
consisting
clouds
collected
static
mobile
laser
corresponding
models
were
analyzed.
In
all
analyzed
cases,
automatically
detected
whether
was
completed
not
compared
provided
model.
Buildings,
Год журнала:
2024,
Номер
14(4), С. 1135 - 1135
Опубликована: Апрель 17, 2024
The
adoption
of
building
information
modelling
(BIM)
enables
data-driven
decision-making
for
many
participants
in
the
construction
process.
Building
authorities
are
stakeholders
that
have
not
yet
benefited
from
data
integration
using
BIM.
In
cases,
parts
their
processes
already
improved
through
digitisation
initiatives.
Now
they
on
threshold
a
major
digital
transformation
enabled
by
BIM
into
processes.
This
study
examines
permit
process
based
entirely
BIM,
developed
at
Vienna
Authority
Austria.
series
workshops
with
all
important
stakeholders,
current
was
captured
detail
and
transferred
to
data-driven,
BIM-based
shows
complete
capture
approval
only
automation
traditional
such
as
code
compliance
checks
neighbourhood
hearings
but
also
supports
introduction
innovative
sub-processes
pre-check
models
augmented
reality-based
neighbours
(in
pilot
phase).
results
suggest
significantly
increases
efficiency
transparency
procedures,
represents
decisive
step
towards
integrating
authority
building.
Buildings,
Год журнала:
2022,
Номер
12(5), С. 638 - 638
Опубликована: Май 10, 2022
Without
a
building
permit,
construction
project
cannot
be
legally
implemented.
For
this,
the
must
undergo
review
process
by
competent
authority.
As
number
of
projects
to
inspected
increases,
authorities
are
faced
with
ever
greater
challenges,
due
lack
adequate
personnel
manage
inefficient,
labor
extensive,
and
lengthy
permit
process.
In-depth
scientific
studies
existing
processes
missing
so
far.
This
paper
introduces
proposed
framework
that
aims
investigate
compare
in
Germany
United
States
America
(USA).
Among
other
things,
studied
for
both
by-right
non-by-right
cases.
In
doing
so,
data
based
on
collected
empirical
study
form
qualitative
expert
interviews.
The
findings
comparison
provide
detailed
description
illustration
current
processes,
as
well
lessons
learned
from
countries.
Advanced Engineering Informatics,
Год журнала:
2023,
Номер
58, С. 102188 - 102188
Опубликована: Сен. 25, 2023
The
building
permitting
process
is
characterized
by
enormous
complexity
and
multidisciplinarity.
It
consists
of
multiple
steps,
many
involved
stakeholders
with
various
responsibilities
personal
goals.
This,
together
the
fact
that
in
common
practice
issuance
a
permit
mostly
manual,
makes
long,
inefficient
subjective.
Digitalization
has
been
subject
interest
for
researchers.
In
this
work,
implementing
systematic
literature
review,
we
map
existing
knowledge
gaps
domain
hinder
further
development
facilitation
technological
solutions
within
process.
This
work
demonstrates
lack
fundamental
research
detailed
investigation
each
individual
sub-process
entire
process,
digital
or
automated
permitting.
Furthermore,
provide
mapping
sub-processes
comprises
of,
as
identified
research.
As
much
efforts
are
focused
on
digitalization
automation
aspects,
also
clear
definition
different
levels
Building Research & Information,
Год журнала:
2023,
Номер
51(5), С. 518 - 532
Опубликована: Март 12, 2023
Building
permitting
plays
a
significant
role
in
life
cycles
of
buildings
because
without
building
permit
legal
construction
fails.
However,
digitalization
permit,
authorities
is
rare
global
context
and
issuing
primarily
manual
time-consuming
process.
In
current
research
approaches
on
digital
permits,
the
focus
lays
building-related
regulation
checks.
Even
if
cover
an
important
step
process,
other
steps
such
as
administrative
processes
are
neglected.
preliminary
research,
process
model
for
structuring
action-oriented
elements
was
developed
transferred
applied
to
Information
Modelling
(BIM)-oriented
process-based
web
application
prototype,
which
serves
basis.
An
empirical
study
–
using
qualitative
expert
interviews
authority
South
Tyrol
(Italy)
conducted
simulate
BIM-oriented
review
well
investigate
thoroughly.
The
results
show
classification
information
needed
tools
supporting
case
authority,
used.
discussion,
knowledge
gained
from
comparison
between
presented
alongside
considerations
follow-up
research.
Advanced Engineering Informatics,
Год журнала:
2024,
Номер
61, С. 102448 - 102448
Опубликована: Март 14, 2024
Automatic
Compliance
Checking
(ACC)
is
a
promising
response
to
the
challenges
involved
in
meeting
building
and
planning
regulations,
increasingly
utilised
by
researchers
context
of
Building
Information
Modelling
(BIM)
Industry
Foundation
Classes
(IFC).
However,
engineers
often
use
computational
methods,
such
as
Finite
Element
Analysis
(FEA),
solve
challenging
engineering
problems.
Such
methods
have
received
little
attention
ACC
BIM.
The
work
presented
here
proposes
holistic
approach,
integrating
FEA
IFC
schema,
utilising
Semantic
Web-based
system
for
ACC.
A
top-level
ontology,
Ontology
(BCO)
proposed,
with
aim
covering
all
aspects
compliance
Built
Environment.
One
novelty
BCO
that
it
revolves
around
modelling
statements
opposed
more
common
approach
components.
In
order
evaluate
effectiveness
applicability
this
process,
real-world
problem
used:
structural
design
codes
members
modular
steel
structure.
An
open-source
solver
FEA,
model
enriched
its
results,
using
an
middleware
Input/Output.
extended
field
engineering,
appropriate
classes
SHACL
checks
are
implemented.
checked
automatically
running
scripts
Web
environment.