Flexible robotic cell scheduling with graph neural network based deep reinforcement learning DOI
Donghai Wang, Shun Liu, Jing Zou

и другие.

Journal of Manufacturing Systems, Год журнала: 2024, Номер 78, С. 81 - 93

Опубликована: Ноя. 26, 2024

Язык: Английский

Deep reinforcement learning driven trajectory-based meta-heuristic for distributed heterogeneous flexible job shop scheduling problem DOI
Qichen Zhang, Weishi Shao,

Zhongshi Shao

и другие.

Swarm and Evolutionary Computation, Год журнала: 2024, Номер 91, С. 101753 - 101753

Опубликована: Окт. 9, 2024

Язык: Английский

Процитировано

3

Deep reinforcement learning-based memetic algorithm for solving dynamic distributed green flexible job shop scheduling problem with finite transportation resources DOI
Xinxin Zhou, Feimeng Wang, Bin Wu

и другие.

Swarm and Evolutionary Computation, Год журнала: 2025, Номер 94, С. 101885 - 101885

Опубликована: Фев. 21, 2025

Язык: Английский

Процитировано

0

Shared manufacturing service composition optimization based on IGWO-GA algorithm DOI
Peng Liu,

Jiating Liang,

Caiyun Liu

и другие.

International Journal of Management Science and Engineering Management, Год журнала: 2025, Номер unknown, С. 1 - 11

Опубликована: Апрель 30, 2025

Язык: Английский

Процитировано

0

Design of coalitional game-based decentralised model for manufacturing services supply-demand transactions towards industrial internet DOI
Jianwei Tang, Shunsheng Guo, Lei Wang

и другие.

Journal of Engineering Design, Год журнала: 2025, Номер unknown, С. 1 - 28

Опубликована: Май 14, 2025

Язык: Английский

Процитировано

0

A multi-objective brain storm optimization for integrated distributed flexible job shop and distribution problems DOI Creative Commons
Yanhe Jia, Yaoyao Zhou, Yaping Fu

и другие.

Heliyon, Год журнала: 2024, Номер 10(16), С. e36318 - e36318

Опубликована: Авг. 1, 2024

Production and distribution are critical components of the furniture supply chain, achieving optimal performance through their integration has become a vital focus for both academic business communities. Moreover, as economic globalization progresses, distributed manufacturing pioneering production technique. Via leveraging flexible system, mass at lower costs can be achieved. To this end, study presents an integrated job shop problem to minimize makespan total tardiness. In our research, set custom orders from different customers processed among shops then delivered by vehicles due date. distinctly show presented problem, mixed integer mathematical programming model is created, multi-objective brain storm optimization method introduced considering problem's features. comparison other three advanced methods, superiority algorithm created showcased. The findings experiments demonstrate that constructed have remarkable competitiveness in addressing being examined.

Язык: Английский

Процитировано

2

Planning and scheduling shared manufacturing systems: key characteristics, current developments and future trends DOI Creative Commons

Ege Duran,

Cemalettin Öztürk, Barry O’Sullivan

и другие.

International Journal of Production Research, Год журнала: 2024, Номер unknown, С. 1 - 33

Опубликована: Дек. 28, 2024

Язык: Английский

Процитировано

2

Flexible robotic cell scheduling with graph neural network based deep reinforcement learning DOI
Donghai Wang, Shun Liu, Jing Zou

и другие.

Journal of Manufacturing Systems, Год журнала: 2024, Номер 78, С. 81 - 93

Опубликована: Ноя. 26, 2024

Язык: Английский

Процитировано

1