
Case Studies in Thermal Engineering, Год журнала: 2024, Номер unknown, С. 105682 - 105682
Опубликована: Дек. 1, 2024
Язык: Английский
Case Studies in Thermal Engineering, Год журнала: 2024, Номер unknown, С. 105682 - 105682
Опубликована: Дек. 1, 2024
Язык: Английский
Scientific Reports, Год журнала: 2025, Номер 15(1)
Опубликована: Фев. 28, 2025
In this thesis, a risk assessment framework based on the Pressure-State-Response (PSR) model is proposed for problem of crossing mined-out region in tunnel construction. The subjective weights indicators are determined by G1 method, objective improved CRITIC method combined with Random Forest (RF) machine learning and calculated using game-theoretic combination assignment method. On basis, two-dimensional cloud was constructed to merge frequency consequence degree comprehensively assess construction's safety across region. Taking construction project Huayingshan Tunnel Linshui County Sichuan Province as an example, eigenvalues each indicator were derived through expert scoring weight calculation, diagram drawn MATLAB software analysis. results show that medium risk, which environmental geological safety, structural stability main sources. This thesis provides new region, can effectively control during
Язык: Английский
Процитировано
0Advances in Space Research, Год журнала: 2025, Номер unknown
Опубликована: Март 1, 2025
Язык: Английский
Процитировано
0International Communications in Heat and Mass Transfer, Год журнала: 2025, Номер 164, С. 108911 - 108911
Опубликована: Март 30, 2025
Язык: Английский
Процитировано
0CATENA, Год журнала: 2025, Номер 256, С. 109050 - 109050
Опубликована: Май 2, 2025
Язык: Английский
Процитировано
0Journal of dynamic disasters., Год журнала: 2025, Номер unknown, С. 100019 - 100019
Опубликована: Май 1, 2025
Язык: Английский
Процитировано
0Case Studies in Thermal Engineering, Год журнала: 2024, Номер unknown, С. 105682 - 105682
Опубликована: Дек. 1, 2024
Язык: Английский
Процитировано
0