Towards the Adoption of AI, IoT, and Blockchain Technologies in Bangladesh's Maritime Industry: Challenges and Insights DOI Creative Commons

Ruthbah Tahsin,

Sakib Bin Alomgir Rantu,

M. A. Rahman

и другие.

Results in Engineering, Год журнала: 2024, Номер unknown, С. 103825 - 103825

Опубликована: Дек. 1, 2024

Язык: Английский

Analyzing Barriers of BIM and Blockchain Integration: A Hybrid ISM-DEMATEL Approach DOI Creative Commons
Qi An, Xinhua Bi, Yongshun Xu

и другие.

Buildings, Год журнала: 2025, Номер 15(8), С. 1370 - 1370

Опубликована: Апрель 20, 2025

Building information modeling (BIM) and blockchain are reshaping construction business processes. This is particularly important for efficient management collaboration, especially in the current environment of complexity fragmentation However, due to limits practical experience exploration, organizations continue face significant challenges adopting integrated BIM blockchain. study concentrates on exploring integration by identifying analyzing key barriers. Through a systematic literature review expert consultation, 13 major barriers have been identified. Relationships among established using interpretive structural (ISM) decision-making trial evaluation laboratory (DEMATEL) approaches. The analysis shows that high initial costs legal regulatory root causes affect adoption integration. Additionally, investment return risk, stakeholder attitudes unclear value proposition great impact overall system. These findings can help practitioners developing planning strategies effective implementation

Язык: Английский

Процитировано

0

Impact Analysis of BIM on Power Substation Project Costs: Techno-Economic Data Evidence from China DOI Creative Commons
Ding Liu,

Lizhong Qi,

Yi Sun

и другие.

Buildings, Год журнала: 2025, Номер 15(11), С. 1885 - 1885

Опубликована: Май 29, 2025

Due to the difficulty in measuring intangible effects and reliance on experts for benefit evaluation, actual project data evidence of impact BIM is insufficient. To this end, study collected total cost from 164 power substation projects techno-economic statements 34 SGCC capture costs explore its patterns. Algorithms such as hierarchical clustering based improved DTW feature selection QDA were designed mining. The findings demonstrate that distribution CV% some specific items became more concentrated after application BIM, which indicates enhanced ability predict control costs. Moreover, five shape patterns identified key BIM. It therefore recommended related should be controlled with focus during

Язык: Английский

Процитировано

0

Blockchain-enabled Cash Flow Management System in Offsite Construction Projects DOI Creative Commons
Mohamed Assaf,

Tarek Zayed,

Mohamed Hussein

и другие.

Results in Engineering, Год журнала: 2025, Номер unknown, С. 105508 - 105508

Опубликована: Июнь 1, 2025

Язык: Английский

Процитировано

0

Client Project Managers’ Knowledge and Skill Competencies for Managing Public Construction Projects DOI Creative Commons
Khaled Medath Aldossari

Results in Engineering, Год журнала: 2024, Номер unknown, С. 103546 - 103546

Опубликована: Ноя. 1, 2024

Язык: Английский

Процитировано

1

The Rehabilitation of the Old Medina of Bejaad, Morocco: a Technological Approach (BIM) to Enhance the Built Heritage DOI Creative Commons

Abdelmalek Ammari,

Jamal Mounaji,

Massimiliano Martino

и другие.

Revista de Gestão Social e Ambiental, Год журнала: 2024, Номер 18(11), С. e08555 - e08555

Опубликована: Ноя. 5, 2024

Objective: This study proposes a process of revitalization and regeneration the old medina Bejaad, as well methodology for technical analysis its urban fabric traditional structures, while respecting inherent values constructions. Through data related to location each building more in-depth investigation, global relationship with environment history is established. Theoretical Framework: The through ancient potential social economic wealth, should be leveraged development this spiritual city. built heritage characterized by buildings that, most part, have preserved an uncommon restraint, maintaining art past construction secrets local housing. Its housing composed two types fabric: recent structures. These are connected network public spaces that bring inhabitants together. Method: Creation specific Building Information Modelling (BIM) object libraries, derived from three-dimensional models created 3D scanning using Lidar technology. Results Discussion: results investigation highlight need identify new methodologies studying environment, which no longer focus solely on individual types, but encompass broader scale fabric, within it possible assess constructive relationships between elements composing block. achieved adopting measures protection, rehabilitation, appropriation their living environment. Originality/Value: practical evaluation approach providing precise improve preservation aim establishing architectural, urban, landscape charter city components.

Язык: Английский

Процитировано

0

Hybrid Framework for Investigating Digital Transformation Barriers in the Oil and Gas Sector DOI Creative Commons
Adel Alshibani,

Saleh Musleh Alkhathami,

Mohammad A. Hassanain

и другие.

Energies, Год журнала: 2024, Номер 17(23), С. 6151 - 6151

Опубликована: Дек. 6, 2024

The oil and gas (O&G) sector depends on information analysis, making digital transformation vital. Industry-specific factors like environmental, regulatory, operational, security challenges shape its tech adoption. This paper identifies examines the barriers drivers of in O&G through a literature review expert insights, leading to questionnaire assessment. Interpretive Structural Modeling (ISM) was employed create structural model that illustrates interactions between these barriers, helping experts understand how achieve digitization within industry. analysis identified key based their RII values: “Experiments requiring significant time for validation new technologies”, “Technical complexities “Security concerns”, “Insufficient strategies”, “Organizational culture resistance change”. ISM indicated technologies” “Lack readily deployable are most influential barriers. Addressing is crucial companies unlock digitalization potential.

Язык: Английский

Процитировано

0

Towards the Adoption of AI, IoT, and Blockchain Technologies in Bangladesh's Maritime Industry: Challenges and Insights DOI Creative Commons

Ruthbah Tahsin,

Sakib Bin Alomgir Rantu,

M. A. Rahman

и другие.

Results in Engineering, Год журнала: 2024, Номер unknown, С. 103825 - 103825

Опубликована: Дек. 1, 2024

Язык: Английский

Процитировано

0