Development of a Quantitative Assessment Algorithm for Operational Risks in Mining Engineering
Resources,
Год журнала:
2025,
Номер
14(4), С. 53 - 53
Опубликована: Март 25, 2025
Whenever
any
type
of
ore
deposit
is
developed,
it
comes
with
significant
risks,
such
as
uncertain
reserves,
harsh
climate
conditions,
and
other
uncontrollable
factors.
To
manage
these
risks
effectively,
companies
need
to
quickly
adapt
changing
conditions.
This
paper
presents
a
method
for
evaluating
using
simulation
model.
The
main
objective
identify
factors
operational
risk
determine
the
project
parameters
that
have
greatest
impact
on
probability
event.
includes
classification
based
way
they
arise;
creation
decomposition
matrix
dividing
by
production
tasks;
construction
mathematical
model
identified
was
tested
developing
an
underground
mine
conveyor
network
in
Anylogic
(8.9.2)
software.
A
experiment
showed
shutdowns
could
result
11.23%
reduction
annual
revenue.
Based
results,
recommendations
were
made
how
can
be
reduced
implement
transport
system
increase
resilience.
Язык: Английский
Method for Calculating Heat Transfer in a Heat Accumulator Using a Phase Change Material with Intensification Due to Longitudinal Fins
В. И. Лебедев,
Andrey Deev,
Konstantin Deev
и другие.
Energies,
Год журнала:
2024,
Номер
17(21), С. 5281 - 5281
Опубликована: Окт. 24, 2024
One
of
the
challenges
in
energy
supply
for
isolated
power
systems
is
maintaining
a
steady
balance
between
generated
and
consumed
energy.
The
application
storage
flexible
sources
most
preferable
approach
these
systems.
Small-
medium-sized
nuclear
plants
are
promising,
carbon-free
options
to
However,
have
low
maneuverability.
To
solve
this
problem,
article
discusses
use
thermal
accumulator
using
phase
change
material
(solar
salt)
heat
feedwater.
Tubes
with
longitudinal
fins
used
intensify
transfer
system.
This
paper
presents
method
calculating
along
entire
exchange
surface
such
an
accumulator.
A
series
2D
simulations
were
conducted
study
solidification
process
solar
salt
around
tube
at
various
temperatures
on
inner
wall
surface.
regression
dependences
temperature
thickness
solid
PCM
layer
determined.
Using
presented
obtained
dependencies,
we
determined
time
graphs
fluid
outlet
during
discharge.
Based
results
presented,
it
was
found
that
72.7
tons
(dimensions:
6
×
3.71
2.15
m)
can
replace
high-pressure
heater
№1
low-power
plant
(50
MW)
3450
s.
Язык: Английский