Applying of 4D modeling at preparation and construction stages
BIO Web of Conferences,
Год журнала:
2024,
Номер
107, С. 06013 - 06013
Опубликована: Янв. 1, 2024
The
term
digital
transformation
of
the
construction
industry
refers
to
process
introducing
and
using
new
technologies,
methods
tools
foster
efficiency,
productivity,
innovation
in
industry.
implies
use
various
solutions
optimize
design,
planning,
construction,
management.
building
information
modeling
(BIM)
allows
for
better
coordination
between
project
stakeholders,
streamlined
design
a
minimum
amount
4D
clashes.
When
applied
enables
integration
three-dimensional
(3D)
model
into
time
dimension
(4D)
scheduling,
managing,
visualizing
coordinating
projects
at
all
stages
their
life
cycle,
from
preparation
operation.
Язык: Английский
Promoting Sustainability in Yemeni Construction SMEs
Advances in business strategy and competitive advantage book series,
Год журнала:
2024,
Номер
unknown, С. 72 - 113
Опубликована: Авг. 13, 2024
This
study
examined
the
relationship
between
project
planning,
risk
management,
and
sustainable
development
at
construction
SMEs
in
Yemen,
emphasizing
mediating
role
of
self-efficacy.
Using
a
self-administered
survey
with
random
sampling
method,
data
was
collected
from
268
employees.
Findings
demonstrated
that
planning
management
had
significant
positive
influence
on
Moreover,
self-efficacy
played
partially
mediator
development.
The
result
suggests
can
enhance
management's
impact
development,
leading
to
reduced
costs,
increased
opportunities
profits,
overall
organizational
success.
research
also
offers
insights
into
fostering
sustainability
within
economy
society,
stressing
its
significance
professional
fields
stable
economic
social
environment.
Язык: Английский
Effect of Implementation of Performance Risk Management on High Rise Building Structure Work (Junction City Building)
International Journal of Research and Review,
Год журнала:
2023,
Номер
10(11), С. 73 - 82
Опубликована: Ноя. 3, 2023
There
are
risks
in
every
construction
project,
uncontrolled
will
become
a
problem
and
cause
losses
to
the
project
due
cost
overruns
delays
work
execution.
Therefore,
manage
risk,
it
is
necessary
carry
out
risk
management
so
that
can
survive,
or
perhaps
optimize
risk.
The
purpose
of
this
study
was
determine
dominant
factors,
how
big
level
occurred
response
given
time
performance
structural
Grand
Jati
Junction
Apartment
Development
project.
From
results
study,
found
8
factors
became
with
varying
(different)
levels
depending
on
complexity
conditions
at
implementation
each
stage
work.
Then
from
factor
analysis,
obtained
form
preventive
measures
prevent
minimize
these
risks.
Keywords:
Risk
Management,
Building
Structure
Work.
Язык: Английский
Project Management Information System (PMIS) Dashboard as a Digital Twin to Enhance Infrastructure Project Delivery: A Case Study of Ameroro Dam Project
Rizky Agung Saputra,
Agung Fajarwanto,
Amy Rachmadhani Widyastuti
и другие.
Proceedings e report,
Год журнала:
2023,
Номер
unknown, С. 1219 - 1232
Опубликована: Янв. 1, 2023
In
supporting
the
economic
growth,
Indonesian
government
has
instructed
to
develop
201
National
Strategic
Infrastructure
Projects,
including
Ameroro
Dam
Project.
Located
in
Southeast
Sulawesi,
construction
process
faced
many
engineering
challenges
with
conventional
monitoring
methods,
such
as
potentially
delayed
action
plan
and
hindered
decision
making
due
insufficient
progress
visualization
data,
inadequate
real-time
unintegrated
data.
Therefore,
Project
Management
Information
System
(PMIS)
dashboard
is
utilized
a
Digital
Twin
innovation
overcome
these
optimize
project
delivery.
This
study
presents
case
approach
on
how
PMIS
could
Dashboard
integrated
Building
Modelling,
Survey,
Geospatial
Data,
Data
that
supports
it
provides
more
reliable
illustrates
comparative
between
method
efficiency
for
better
management.
The
effectiveness
of
can
be
seen
data
working
along
schedule.
Moreover,
helps
engineers
risk
mitigation
performance
display.
Eventually,
paper
concludes
by
optimization
dam
project,
leading
efficient
infrastructure
management
Язык: Английский
Project Management Information System (PMIS) Dashboard as a Digital Twin to Enhance Infrastructure Project Delivery: A Case Study of Ameroro Dam Project
Rizky Agung Saputra,
Agung Fajarwanto,
Amy Rachmadhani Widyastuti
и другие.
Proceedings e report,
Год журнала:
2023,
Номер
unknown, С. 1219 - 1232
Опубликована: Янв. 1, 2023
In
supporting
the
economic
growth,
Indonesian
government
has
instructed
to
develop
201
National
Strategic
Infrastructure
Projects,
including
Ameroro
Dam
Project.
Located
in
Southeast
Sulawesi,
construction
process
faced
many
engineering
challenges
with
conventional
monitoring
methods,
such
as
potentially
delayed
action
plan
and
hindered
decision
making
due
insufficient
progress
visualization
data,
inadequate
real-time
unintegrated
data.
Therefore,
Project
Management
Information
System
(PMIS)
dashboard
is
utilized
a
Digital
Twin
innovation
overcome
these
optimize
project
delivery.
This
study
presents
case
approach
on
how
PMIS
could
Dashboard
integrated
Building
Modelling,
Survey,
Geospatial
Data,
Data
that
supports
it
provides
more
reliable
illustrates
comparative
between
method
efficiency
for
better
management.
The
effectiveness
of
can
be
seen
data
working
along
schedule.
Moreover,
helps
engineers
risk
mitigation
performance
display.
Eventually,
paper
concludes
by
optimization
dam
project,
leading
efficient
infrastructure
management
Язык: Английский