
Applied Mathematics and Nonlinear Sciences, Journal Year: 2024, Volume and Issue: 9(1)
Published: Jan. 1, 2024
Abstract In this paper, we take a two-level distribution grid as the infrastructure of multilevel and study comprehensive carrying capacity assessment model in depth. The minimum value maximum access under each scenario is used to assess network, volume network taken objective function, particle swarm algorithm improved establish model. Using alternating direction multiplier method, distributed optimization established, problem transformed into subproblem at all levels grid. Comparing whale algorithm, paper converges 7465 kW about 12 iterations, respectively, weak degree below 0.4 different states, which good performance terms accuracy degree. We conduct simulation experiments with modified IEEE33 nodes find that using paper’s participate optimal scheduling reduces total operating cost system by more than 6.24% compared not it. Finally, use evaluate Ningxia, China.
Language: Английский