Scheduling optimization of ship plane block flow line considering dual resource constraints DOI Creative Commons

Jinghua Li,

Pengfei Lin,

Xiaoyuan Wu

et al.

Scientific Reports, Journal Year: 2024, Volume and Issue: 14(1)

Published: Dec. 28, 2024

A well-designed scheduling plan that meets the practical constraints of workshop is crucial for enhancing production efficiency in ship plane block assembly. Unlike traditional flow line problems, optimization problem involves dual resource constraints, including work teams and spare parts supply limitations. This can be seen as a Dual Resource Constrained Blocked Flow Shop Scheduling Problem (DRCBFSP). paper presents method this kind to minimize maximum completion time. To address chromosomes are encoded two-dimensional array composed positive integers representing assembly order blocks allocation teams. An improved Grey Wolf Optimization Algorithm (IGWO) proposed solve problem, Rank Order Value (ROV) rule used transform discrete solution with continuous individual position vector. The IGWO algorithm also incorporates nonlinear search factors, dynamic inertia weight Gaussian mutation perturbation strategies enhance its development exploration capabilities. experimental results suggest mathematical model established effectively DRCBFSP encountered building.

Language: Английский

A Q-learning-based improved multi-objective genetic algorithm for solving distributed heterogeneous assembly flexible job shop scheduling problems with transfers DOI
Zhijie Yang,

Xiaosen Hu,

Yibing Li

et al.

Journal of Manufacturing Systems, Journal Year: 2025, Volume and Issue: 79, P. 398 - 418

Published: Feb. 8, 2025

Language: Английский

Citations

1

Capacity assessment for single batch machine production with interval grey processing time DOI

Yihang Qin,

Naiming Xie, Yuquan Wang

et al.

Grey Systems Theory and Application, Journal Year: 2025, Volume and Issue: unknown

Published: April 9, 2025

Purpose This paper aims to propose a capacity assessment approach for production with uncertainty, focusing on single batch machine interval grey processing time. Design/methodology/approach Based the number and its mathematical operations, uncertain time is defined as research object. The times generation methods are then developed, which rely specific definitions historical data. A tailored this mode subsequently proposed, validity demonstrated through multiple real-world cases from one aerospace composite material manufacturer. Findings proposed provides reliable results various types of tasks. For tasks small jobs or significant variations in job sizes, can be obtained first stage, known model assessment. remaining tasks, achieved second heuristic Research limitations/implications In paper, validated based production. To enhance applicability more actual scenarios, needs extend modes. algorithm have certain limitations need further designed suit other Originality/value novel And it helps promote application system theory management.

Language: Английский

Citations

0

Simheuristics DOI
Ángel A. Juan, Majsa Ammouriova, Javier Faulín

et al.

Published: Jan. 1, 2025

Citations

0

A multi-objective production scheduling model and dynamic dispatching rules for unrelated parallel machines with sequence-dependent set-up times DOI Creative Commons
Pham Duc Tai,

Papimol Kongsri,

Prasal Soeurn

et al.

Decision Analytics Journal, Journal Year: 2024, Volume and Issue: 13, P. 100525 - 100525

Published: Nov. 4, 2024

Language: Английский

Citations

1

A Flexible Job Shop Scheduling Problem Involving Reconfigurable Machine Tools Under Industry 5.0 DOI
Hessam Bakhshi-Khaniki, Reza Tavakkoli‐Moghaddam, Zdeněk Hanzálek

et al.

IFIP advances in information and communication technology, Journal Year: 2024, Volume and Issue: unknown, P. 244 - 257

Published: Jan. 1, 2024

Language: Английский

Citations

0

Scheduling optimization of ship plane block flow line considering dual resource constraints DOI Creative Commons

Jinghua Li,

Pengfei Lin,

Xiaoyuan Wu

et al.

Scientific Reports, Journal Year: 2024, Volume and Issue: 14(1)

Published: Dec. 28, 2024

A well-designed scheduling plan that meets the practical constraints of workshop is crucial for enhancing production efficiency in ship plane block assembly. Unlike traditional flow line problems, optimization problem involves dual resource constraints, including work teams and spare parts supply limitations. This can be seen as a Dual Resource Constrained Blocked Flow Shop Scheduling Problem (DRCBFSP). paper presents method this kind to minimize maximum completion time. To address chromosomes are encoded two-dimensional array composed positive integers representing assembly order blocks allocation teams. An improved Grey Wolf Optimization Algorithm (IGWO) proposed solve problem, Rank Order Value (ROV) rule used transform discrete solution with continuous individual position vector. The IGWO algorithm also incorporates nonlinear search factors, dynamic inertia weight Gaussian mutation perturbation strategies enhance its development exploration capabilities. experimental results suggest mathematical model established effectively DRCBFSP encountered building.

Language: Английский

Citations

0