Energy, Journal Year: 2023, Volume and Issue: 289, P. 129808 - 129808
Published: Dec. 9, 2023
Language: Английский
Energy, Journal Year: 2023, Volume and Issue: 289, P. 129808 - 129808
Published: Dec. 9, 2023
Language: Английский
Lecture notes in electrical engineering, Journal Year: 2025, Volume and Issue: unknown, P. 275 - 286
Published: Jan. 1, 2025
Language: Английский
Citations
0Energy, Journal Year: 2024, Volume and Issue: 303, P. 131774 - 131774
Published: May 30, 2024
Language: Английский
Citations
3Applied Energy, Journal Year: 2024, Volume and Issue: 374, P. 124075 - 124075
Published: Aug. 1, 2024
The decarbonization of the mobility sector motivates to increase penetration battery and fuel-cell electric vehicles. proliferation these modes will be accompanied by massive installation charging refilling infrastructures into existing networks. This work focuses on vehicles, for which points are needed. Difficulties in hydrogen transportation can circumvented deploying onsite generation assets (electrolysers) storage, partially or fully supplied through local renewable generators. Nevertheless, such require a considerable initial investment, being necessary use planning tools order maximize revenues private investors. paper this issue. In particular, an optimal sitting sizing tool stations with storage electrolysers is developed. developed methodology considers influence locational marginal prices, cleared distribution system operator translate real electricity cost per node. pricing strategy helps best allocate network thus resulting valuable planners site properly. An original multi-year iterative algorithm based multi-cut Benders' decomposition proposed alleviate intrinsic high computational while accommodate long-term inflation degradation rates parameters. A number simulations performed well-known IEEE 33-bus system. Results verify that effectively translates nodal end-users. Remark, total electrolysis capacity turns out most significant parameter, reducing further project, has limited influence. highlight importance infrastructure when determining placement electrolysers, supporting decisions upgrading infrastructure. impact installed budget cap also analysed, showing both parameters have similar may reduce project 70% approximately. typical scheduling behaviour electrolysis-storage facilities discussed, how capable provide energy arbitrage exploiting prices. Finally, performance assessed, verifying new efficient portable.
Language: Английский
Citations
3Journal of Energy Storage, Journal Year: 2024, Volume and Issue: 103, P. 114244 - 114244
Published: Oct. 23, 2024
Language: Английский
Citations
2Energy, Journal Year: 2023, Volume and Issue: 289, P. 129808 - 129808
Published: Dec. 9, 2023
Language: Английский
Citations
6