
Energies, Journal Year: 2025, Volume and Issue: 18(6), P. 1328 - 1328
Published: March 7, 2025
This paper presents placement optimization for battery energy storage system installation using a fuzzy expert system. Nowadays, the Bangkok Metropolitan Administration (BMA) has installed CCTV cameras surveillance, deterrence, and to record events as evidence legal proceedings. However, in some areas, there is no BESS, so when power goes out, recording cannot continue. article uses Fuzzy Logic Expert System assess critical areas consideration of future BESS Bangkok. The key factors include (1) number image requests from Administration, (2) duration outages BMA, (3) total consumption each subdistrict. study results show that can effectively handle ambiguous data improve decision-making. Latkrabang Lamphlatiew subdistricts have most points where investment appropriate. size was determined based on maximum recorded outage 57 min, with backup design set at 1 h. DIgSILENT program used determine point, which calculated be 160.2 Wh.
Language: Английский