A Comprehensive Evaluation Model with TOPSIS Method for Construction Site Layout of Building Projects and Its Applications DOI
Qiurui Liu, Ping Zhang, Lin Chen

et al.

Journal of Urban Planning and Development, Journal Year: 2024, Volume and Issue: 150(3)

Published: June 12, 2024

Language: Английский

Intelligent planning of safe and economical construction sites: Theory and practice of hybrid multi objective decision making DOI
Junwu Wang,

Zhihao Huang,

Yinghui Song

et al.

Frontiers of Engineering Management, Journal Year: 2024, Volume and Issue: unknown

Published: Aug. 19, 2024

Language: Английский

Citations

2

Evaluating the Digital Transformation Potential in Pre-Construction for Sustainable Practices Using Structural Equation Modeling DOI Open Access
Khalid K. Naji, Murat Gündüz, Fahid Hamad Alhenzab

et al.

Sustainability, Journal Year: 2024, Volume and Issue: 16(17), P. 7323 - 7323

Published: Aug. 26, 2024

This study presents the development of a comprehensive model for evaluating level readiness buildings digital transformation during pre-construction phase. The proposed utilizes structural equation modeling (SEM) and includes full list key factors achieving success. tool is designed to support industry stakeholders in assessing operational efficiency terms phase (DTRPC) analyze effectiveness limitations DTRPC across various management levels. Key success were identified through interviews with experts review relevant literature. These variables then validated two rounds 8 Delphi technique, which included input 13 highly qualified experts. Finally, an online questionnaire was disseminated professionals, who assessed factors’ relative levels significance. Questionnaire responses collected from sample 300 individuals different professional fields. SEM used quantitatively relationships between components factors. goal determine impact each construct on overall readiness. underwent thorough evaluation its strength stability several parameters, including accuracy, conformity multivariate normalcy, reliability validity. A hypothesis analysis also conducted. data develop model, consisting 30 essential performance indicators grouped into four categories. use uncovered significant correlation these critical groups, as well influence effective constructs project performance. research expands current knowledge by identifying important indications using them create global that can be measuring at stage. has potential provide assistance organizations, managers, policymakers making informed decisions.

Language: Английский

Citations

2

Minimizing Carbon Emission of Prefabricated Reinforced Concrete T-Beams Using BIM and Two-Stage Metaheuristic Searching DOI
Keyu Chen, Yanbo Zhang,

B. You

et al.

Journal of Computing in Civil Engineering, Journal Year: 2023, Volume and Issue: 38(1)

Published: Oct. 20, 2023

As an essential sector of the construction industry, bridge produces a large amount carbon dioxide and other greenhouse gases, greatly intensifying global effect. Prefabricated reinforced concrete (RC) T-beams are vital type structural element widely used in projects such as river-spanning bridges, high-speed railways, urban expressways. This study proposes optimization framework using building information modeling (BIM) two-stage metaheuristic searching (MS) order to minimize emission prefabricated RC T-beams. Under constraints corresponding design specifications, first stage proposed MS is utilized optimize longitudinal steel section size area T-beam, with objective. The optimal combination rebar diameters then obtained second MS. An illustrative example also provided demonstrate performance framework. Moreover, compared conventional approaches well algorithms validate developed approach.

Language: Английский

Citations

6

Interaction Between Airport Facilities And The Surrounding Area Within The GIS And BIM Interoperability DOI Open Access
Alessandro Di Graziano, Eliana Ragusa,

Domenico Trifilò

et al.

Transportation research procedia, Journal Year: 2023, Volume and Issue: 69, P. 273 - 280

Published: Jan. 1, 2023

In the planning and management of civil facilities, geospatial data plays a crucial role. Traditionally, Geographic Information System (GIS) is tool for storing, manipulating analysing spatial geographic data. However, recent developments in new methods technologies are reshaping methodologies processes Architecture, Engineering Construction industry. Encouraged by current regulatory system, an improvement approach, leading from traditional to shared highly integrated digital model, now made possible using Building Modelling (BIM). The collaborative project environment, typical BIM tools, could become important key success factor, especially framework interoperability with other systems, such as GIS. Focusing on airfield, this study aims evaluate potentiality benefits given implementation airport facilities system their interaction surrounding area. results reveal that GIS enables achieve broader deeper understanding models larger territorial context, facilitating instance analysis interferences aircraft operations between surroundings. Furthermore, having implemented overall optimisation management, maintenance, control monitoring processes, well better quality saving time costs, be observed. For purpose, application case research work confirms validity related practical features proposed framework. fact, investigating main requirements characteristics taken into account during BIM-GIS present approach may constitute support facilities.

Language: Английский

Citations

5

A Comprehensive Evaluation Model with TOPSIS Method for Construction Site Layout of Building Projects and Its Applications DOI
Qiurui Liu, Ping Zhang, Lin Chen

et al.

Journal of Urban Planning and Development, Journal Year: 2024, Volume and Issue: 150(3)

Published: June 12, 2024

Language: Английский

Citations

1