Development of Hardware Module for Collecting Parameters of Microhydroelectric Power Plant Operation in Mountainous Conditions DOI
Stefan V. Onishchenko,

Aliy R. Mamiy,

Konstantin A. Yurkaev

et al.

2022 International Conference on Industrial Engineering, Applications and Manufacturing (ICIEAM), Journal Year: 2024, Volume and Issue: unknown, P. 245 - 249

Published: May 20, 2024

Hydropower plants play a major role in the global energy sector, generating up to 17% of all generated. Despite this, spread small hydropower is not as extensive, although it has an extremely large potential and competitive renewable source, have high efficiencies 80%. The implementation such complexes requires preliminary assessment their efficiency, for which atlases data from existing GIS systems are most often used, but they may information on rivers streams, do allow seasonal changes water landscape, particularly pronounced mountainous terrain. Therefore, this paper proposes examine process developing station suitable use streams terrain, can be used means collect production profile mountain will help establish dependencies balance system, achieving sustainable through involvement other generation sources.

Language: Английский

Realization of the program part of the data collection module on the functioning of microhydropower plants DOI Open Access

С.В. Онищенко,

А.Р. Мамий,

Д. А. Василенко

et al.

Вестник Адыгейского государственного университета серия «Естественно-математические и технические науки», Journal Year: 2024, Volume and Issue: 1(336)

Published: June 11, 2024

Предложена реализация модуля автоматизированного сбора данных о функционировании микрогидроэлектростанции, который позволит производить запись необходимых для оценки эффективности использования подобных генерирующих устройств параметров и передавать полученные данные на стороннее устройство, выступающее в роли сервера. The realization of the module automated data collection on microhydroelec-tric power plant functioning is proposed, which will allow to record parameters necessary evaluate effectiveness such generating devices and transfer obtained a third-party device acting as server.

Language: Русский

Citations

0

Development of the Module of Charging Stations Placement for Electric Transport Based on Genetic Algorithm DOI
Semen V. Teploukhov,

Dmitrij N. Lisov,

Pavel Yu. Buchatskiy

et al.

Published: May 22, 2024

The implementation of energy transformation strategies has led to tangible changes in the approaches organization modern systems through involvement new generation sources and types consumers that require better planning distributed systems. One example such innovations is ubiquity electric transportation large cities, which becoming widespread. This process driven by various factors, most important environmental safety factor society. Despite fact development technology makes transport more capable competitive with traditional types, there are some limitations, primarily due low autonomy vehicles, leads need organize specialized charging points. problem station location involves determining optimal locations for placement, depending on selected parameters target function, used: linear programming, multi-criteria meta-heuristic optimization, genetic evolutionary algorithms. paper considers software module vehicle stations based use algorithm, main criterion maximum utilization rate operated stations.

Language: Английский

Citations

0

The Use of Modern Generative Models of Artificial Intelligence for Organization of Knowledge Management Subsystem in Information-analytical System DOI

Viktorija V. Buchatskaya,

David A. Atagyan,

Stefan V. Onishchenko

et al.

Published: May 22, 2024

The article discusses the possibility of using artificial intelligence technologies and modern generative models in knowledge management systems creation energy involving renewable sources. main features realized through use such are considered, methods these to collect, analyze systematize data related energy, taking into account its dynamic nature environmental impact discussed. advantages decision making, process optimization improving efficiency information-analytical considered.

Language: Английский

Citations

0

Development of Hardware Module for Collecting Parameters of Microhydroelectric Power Plant Operation in Mountainous Conditions DOI
Stefan V. Onishchenko,

Aliy R. Mamiy,

Konstantin A. Yurkaev

et al.

2022 International Conference on Industrial Engineering, Applications and Manufacturing (ICIEAM), Journal Year: 2024, Volume and Issue: unknown, P. 245 - 249

Published: May 20, 2024

Hydropower plants play a major role in the global energy sector, generating up to 17% of all generated. Despite this, spread small hydropower is not as extensive, although it has an extremely large potential and competitive renewable source, have high efficiencies 80%. The implementation such complexes requires preliminary assessment their efficiency, for which atlases data from existing GIS systems are most often used, but they may information on rivers streams, do allow seasonal changes water landscape, particularly pronounced mountainous terrain. Therefore, this paper proposes examine process developing station suitable use streams terrain, can be used means collect production profile mountain will help establish dependencies balance system, achieving sustainable through involvement other generation sources.

Language: Английский

Citations

0