Sustainable seascapes: An in-depth analysis of multigeneration plants utilizing supercritical zero liquid discharge desalination and a combined cycle power plant
Nour A. Moharram,
No information about this author
A.H. Konsowa,
No information about this author
Ali I. Shehata
No information about this author
et al.
Alexandria Engineering Journal,
Journal Year:
2025,
Volume and Issue:
118, P. 523 - 542
Published: Jan. 27, 2025
Language: Английский
Numerical investigation on the effects of pilot fuel and natural gas injection pressures on methane slip in a large marine dual-fuel engine
Xuefei Ao,
No information about this author
Huibing Gan,
No information about this author
Mingjiang Xin
No information about this author
et al.
Energy,
Journal Year:
2024,
Volume and Issue:
312, P. 133675 - 133675
Published: Nov. 1, 2024
Language: Английский
Comparison of microstructural evolution and high temperature oxidation behavior of AlCoCrFeNiTi and AlCoCrFeNiZr high-entropy alloy coatings
Surface and Coatings Technology,
Journal Year:
2024,
Volume and Issue:
494, P. 131529 - 131529
Published: Oct. 1, 2024
Language: Английский
Economic Analysis of Solid Oxide Fuel Cell Systems Utilizing Natural Gas as Fuel
Yantao Yang,
No information about this author
Yilin Shen,
No information about this author
Tanglei Sun
No information about this author
et al.
Energies,
Journal Year:
2024,
Volume and Issue:
17(11), P. 2694 - 2694
Published: June 1, 2024
Solid
oxide
fuel
cell
power
generation
systems
are
devices
that
utilize
solid
electrolytes
to
transfer
ions
for
electrochemical
energy
conversion.
A
wide
range
of
gases
can
be
used
as
gas,
including
hydrogen,
natural
and
carbon
monoxide.
Considering
the
high
cost
pure
hydrogen
production
from
gas
reforming
has
become
a
hot
research
area.
In
this
study,
4F-LCA
method
was
employed
construct
an
evaluation
framework,
with
particular
emphasis
on
analysis
systems,
uses
bottom-up
approach
build
system
economic
model
visualize
major
costs
involved
in
system.
An
benefit
sensitivity
were
carried
out
2
kW
case
by
taking
financial
net
present
value
(NPV),
internal
rate
return
(IRR)
payback
period
into
account.
investment
obtained,
which
provide
reference
project
construction
operation
systems.
Language: Английский