Lean and industry 4.0 principles toward industry 5.0: a conceptual framework and empirical insights from fashion industry DOI
Virginia Fani, Ilaria Bucci, Mónica Rossi

et al.

Journal of Manufacturing Technology Management, Journal Year: 2024, Volume and Issue: 35(9), P. 122 - 141

Published: July 2, 2024

Purpose Examining synergies between Lean, Industry 4.0, and 5.0 principles, the aim is to showcase how Lean's focus on people enhances implementations, leading development of Lean paradigm. In addition, insights from artisanal industries, like fashion one, are specifically collected. Design/methodology/approach First, a literature review was conducted define comprehensive framework understand fits into Human-Centric (HC) paradigm 5.0. Second, case study employed give empirical identify practical initiatives that brands can pursue, involving two best-in-class leather goods located in Italy. Findings A conceptual pave way for new defined validated through study. To path industry, HC detailed domains related categories group practices. The demonstrate actions be effectively supported by 4.0 technologies traditional sectors shifting towards Practical implications proposed practices used companies facilitate their transition 5.0, leveraging Manufacturing. Originality/value innovative contribution present work mainly refers framework, encompassing introducing enriches contributions industry.

Language: Английский

Flexible job shop scheduling with stochastic machine breakdowns by an improved tuna swarm optimization algorithm DOI
Chengshuai Fan, Wentao Wang, Jun Tian

et al.

Journal of Manufacturing Systems, Journal Year: 2024, Volume and Issue: 74, P. 180 - 197

Published: March 19, 2024

Language: Английский

Citations

18

A disjunctive graph-based metaheuristic for flexible job-shop scheduling problems considering fixture shortages in customized manufacturing systems DOI
Jiahang Li, Qihao Liu, Cuiyu Wang

et al.

Robotics and Computer-Integrated Manufacturing, Journal Year: 2025, Volume and Issue: 95, P. 102981 - 102981

Published: Feb. 20, 2025

Language: Английский

Citations

4

Multi-objective fitness landscape-based estimation of distribution algorithm for distributed heterogeneous flexible job shop scheduling problem DOI
Fuqing Zhao, Mengjie Li, Ningning Zhu

et al.

Applied Soft Computing, Journal Year: 2025, Volume and Issue: unknown, P. 112780 - 112780

Published: Jan. 1, 2025

Language: Английский

Citations

2

Tackling dual-resource flexible job shop scheduling problem in the production line reconfiguration scenario: An efficient meta-heuristic with critical path-based neighborhood search DOI
Ziyu Zhang, Xinyu Li, Liang Gao

et al.

Advanced Engineering Informatics, Journal Year: 2025, Volume and Issue: 65, P. 103282 - 103282

Published: April 3, 2025

Language: Английский

Citations

2

Industry 5.0 and sustainability: An overview of emerging trends and challenges for a green future DOI
Rame Rame, Purwanto Purwanto,

Sudarno Sudarno

et al.

Innovation and Green Development, Journal Year: 2024, Volume and Issue: 3(4), P. 100173 - 100173

Published: Aug. 19, 2024

Language: Английский

Citations

16

Review on ensemble meta-heuristics and reinforcement learning for manufacturing scheduling problems DOI
Yaping Fu, Yifeng Wang, Kaizhou Gao

et al.

Computers & Electrical Engineering, Journal Year: 2024, Volume and Issue: 120, P. 109780 - 109780

Published: Oct. 18, 2024

Language: Английский

Citations

15

An improved memetic algorithm for multi-objective resource-constrained flexible job shop inverse scheduling problem: An application for machining workshop DOI

Shupeng Wei,

Hongtao Tang, Xixing Li

et al.

Journal of Manufacturing Systems, Journal Year: 2024, Volume and Issue: 74, P. 264 - 290

Published: March 27, 2024

Language: Английский

Citations

11

A reinforcement learning enhanced memetic algorithm for multi-objective flexible job shop scheduling toward Industry 5.0 DOI
Xiao Chang, Xiaoliang Jia, Jiahao Ren

et al.

International Journal of Production Research, Journal Year: 2024, Volume and Issue: unknown, P. 1 - 29

Published: May 30, 2024

Flexible job shop scheduling problem (FJSP) with worker flexibility has gained significant attention in the upcoming Industry 5.0 era because of its computational complexity and importance production processes. It is normally assumed that each machine typically operated by one at any time; therefore, shop-floor managers need to decide on most efficient assignments for machines workers. However, processing time variable uncertain due fluctuating environment caused unsteady operating conditions learning effect Meanwhile, they also balance workload while meeting efficiency. Thus a dual resource-constrained FJSP worker's fuzzy (F-DRCFJSP-WL) investigated simultaneously minimise makespan, total workloads maximum workload. Subsequently, reinforcement enhanced multi-objective memetic algorithm based decomposition (RL-MOMA/D) proposed solving F-DRCFJSP-WL. For RL-MOMA/D, Q-learning incorporated into perform neighbourhood search further strengthen exploitation capability algorithm. Finally, comprehensive experiments extensive test instances case study aircraft overhaul are conducted demonstrate effectiveness superiority method.

Language: Английский

Citations

11

Industry 5.0 in Smart Education: Concepts, Applications, Challenges, Opportunities, and Future Directions DOI Creative Commons

Y. Supriya,

Dasari Bhulakshmi, Sweta Bhattacharya

et al.

IEEE Access, Journal Year: 2024, Volume and Issue: 12, P. 81938 - 81967

Published: Jan. 1, 2024

Industry 5.0 is one of the emerging stages industrialization in which humans collaborate with cutting-edge technologies to enhance various workplace processes. The primary objective emphasize meeting needs people and provide enhanced resilience understanding sustainability. enables cooperation such advanced stakeholders education sector ensure efficiency effectiveness teaching-learning process. present study provides an exhaustive review role smart education. At outset, a brief overview scenario its associated challenges presented. This sets stage for establishing need Education 1.0 progressive transition 4.0. Further, motivation integrate 4.0 related enabling that support are discussed. paper extensively description application educational sectors namely medical education, further learning, distance engineering shop floor training. also presents seven case studies highlighting successful implementation versatile regions. Finally, discussed pointing potential future directions research.

Language: Английский

Citations

10

Solving multi-objective energy-saving flexible job shop scheduling problem by hybrid search genetic algorithm DOI
L. Hao, Zhiyuan Zou, Xu Liang

et al.

Computers & Industrial Engineering, Journal Year: 2025, Volume and Issue: unknown, P. 110829 - 110829

Published: Jan. 1, 2025

Language: Английский

Citations

1